Inspectors and spatter, 6G
Posted: Fri Oct 03, 2014 11:59 am
Im practicing downhill 6G. My filler/cover pass I am using 7010 rod. I am encountering quite a bit of spatter when I am finished. Its not sever but it is present, especially on the top of the pipe.
Will inspectors in the field have a policy against spatter? Is there any method of spatter control I could consider?
Along with that, what is the inspectors policy with grinding out the root before hot, fill, and cover pass? What is the inspectors policy on grinding the face of the pipe to rid the pipe of spatter?
Will inspectors in the field have a policy against spatter? Is there any method of spatter control I could consider?
Along with that, what is the inspectors policy with grinding out the root before hot, fill, and cover pass? What is the inspectors policy on grinding the face of the pipe to rid the pipe of spatter?