Here are some pictures of the last thing I built.
It was painted and moved in place yesterday or the day before I believe.
It's all 2" schd 40 pipe, I was using my stick welder and a co worker was cutting and Migging whenever he wansn't cutting.
Took a lot of messing up and fixing as I am no master of squaring unfortunately I don't have the magic sight of knowing where to weld to re-square
Built the 3 center pieces first with all the angled supports and then laid them all on an uneven floor (as they were painting their shop floor) so we had to move the show outside on an asphalt sloped driveway
Then did 2 of the center peices and tacked in the cross pieces, then tried to stand it up and it all broke apart
Then I redid all the tacks, lined it up "squared" it up and did a halfway weld on every piece to keep it from breaking, then added the 3rd section and welded half of all the joints, stood it up and considered going home...
The whole frame was tilting to the side
Ended up having to cut must of my tacks up and pulling straps across the frame to try and square it up, broke some pipe off pulled the strap in such a way that I could jump on the strap when it was tight to try and stretch the frame to go where I wanted. Every time I jumped you could hear a squeak and the frame would shift and shift right back, someone walked by and said it sounded just like their wedding night
After 4 hours of resquaring, It finally squared back up. Welded away for the next 6 hours until it was 6 AM
Grabbed the forklift, picked it up, dropped it twice and then figured out how to pick it up without dropping it and moved it inside, put it down, checked the feet and level, went outside angled the sloped ends so the feet could stand flat and welded plate onto the feet with the frame on the forklift.
And she was done.