Material 1 pc. 1/2"T x 8" x 8" 3" sq. tube 1/4 wall Both HRS
I am welding the 3" tube center of the 1/2 plate. First time I set the tube center and welded and it cupped at the corners about 3/16". So somebody said cut a hole in the center of the 1/2" so I machined a 2-1/2 sq. hole thru it, centered the 3" tube a welded. It still oil canned about the same. Any remedies? BTW, the 1/2" was flat prior to welding.
Dave,
Great movie! I'm expecting a coloring book to come out with Mr Shrink to color. Boy! That would give you something to do on those cold Minnesota nights! That was so good, even I go it!
Lincoln MP 210, Lincoln Square Wave 200,
Everlast 210 EXT
Thermal Dynamics 25 Plasma cutter
" Anything that carries your livelihood wants to be welded so that Thor can’t break it."
CJ737
tungstendipper wrote:Dave,
Great movie! I'm expecting a coloring book to come out with Mr Shrink to color. Boy! That would give you something to do on those cold Minnesota nights! That was so good, even I go it!
I show it in class - high school kids and us adults learn from that old video
If I ever see a new fangled version of it, it'll have to be really good before I use it instead
Dave J.
Beware of false knowledge; it is more dangerous than ignorance. ~George Bernard Shaw~
Syncro 350
Invertec v250-s
Thermal Arc 161 and 300
MM210
Dialarc
Tried being normal once, didn't take....I think it was a Tuesday.