I welded two 1/2" HRS plates together in a T joint, both sides vertical down. Then I laid the joint flat and clamped it to the table and started wailing with a two handed sledge hammer. The first 35 blows only bent the vertical plate and had no visible effect on the weld. The next 21 hits started to show a little crack at the toe of the start side of the weld in tension (all blows were from right to left). The 57th hit broke the weld.
I'm using a Hobart IM230, with 030 ER70s6, and C25. Settings were 9/85.
This seemed pretty strong to me, but then I'm not a veteran of too many hammer tests. Is this result pretty good and I worry too much, or is this a poor weld and I've set the bar too low?




So what do you guys think?