What welding projects are you working on? Are you proud of something you built?
How about posting some pics so other welders can get some ideas?
Post Reply
  • Posts:
  • Joined:
    Sun May 01, 2016 7:46 am
  • Location:
    Fort Myers Florida

Just a little 342 pounds per foot beam job in the shop. 7/64" Dual Shield FCAW (100% UT inspections) plus 1434 holes to drill.
beam.jpg
beam.jpg (43.38 KiB) Viewed 1363 times
beam1.jpg
beam1.jpg (34.23 KiB) Viewed 1363 times
Dry Fit.jpg
Dry Fit.jpg (145.35 KiB) Viewed 1353 times
AWS D1.1 / ASME IX / CWB / API / EWI / RWMA / BSEE
Scientists have substituted mathematics for experiments, and they wander off through equation after equation, and eventually build a structure which has no relation to reality." Nikola Tesla
Artie F. Emm
  • Posts:
  • Joined:
    Thu Jul 24, 2014 7:53 am

Dang. Some pretty hefty material, that's for sure. Who gets to drill all those holes, and how do they drill them?
Dave
aka "RTFM"
  • Posts:
  • Joined:
    Sun May 01, 2016 7:46 am
  • Location:
    Fort Myers Florida

My Italian guy....."FICEP CNC beam line lol"
AWS D1.1 / ASME IX / CWB / API / EWI / RWMA / BSEE
Scientists have substituted mathematics for experiments, and they wander off through equation after equation, and eventually build a structure which has no relation to reality." Nikola Tesla
Artie F. Emm
  • Posts:
  • Joined:
    Thu Jul 24, 2014 7:53 am

OK, so not some guy with a mag drill and some cutting oil, good to hear!
Dave
aka "RTFM"
  • Posts:
  • Joined:
    Sun May 01, 2016 7:46 am
  • Location:
    Fort Myers Florida

Funny you should say that...there are 4- 50 footers that are to heavy for the beam line to handle, the guys name is Luis on the back to back mag drills :lol:
AWS D1.1 / ASME IX / CWB / API / EWI / RWMA / BSEE
Scientists have substituted mathematics for experiments, and they wander off through equation after equation, and eventually build a structure which has no relation to reality." Nikola Tesla
thatoneguy
  • Posts:
  • Joined:
    Wed Apr 20, 2016 12:08 pm
  • Location:
    Texas

Dang... That's some heavy stuff lol. What is the job for? Would love to see more pics!
Everlast Power I-MIG 275P
Everlast Power TIG 250EX
Everlast Power Plasma 80S
Lincoln AC/DC Tombstone
Smith OxyAcetylene
  • Posts:
  • Joined:
    Sun May 01, 2016 7:46 am
  • Location:
    Fort Myers Florida

Unfortunately nothing classy, they are basically a truss system that will hold up 21 stories of a High Rise Condo over in Miami.
AWS D1.1 / ASME IX / CWB / API / EWI / RWMA / BSEE
Scientists have substituted mathematics for experiments, and they wander off through equation after equation, and eventually build a structure which has no relation to reality." Nikola Tesla
Post Reply