Hi all,
First Post here on this site.
Wpuld really like some advice on a project I'm working on.
So I'm building a new welding table (see render pictures).
So I picked up the (1200x900x12) top from the laser cutters and it has some crown in it, havent actually measured it yet but maybe 2mm, mostly across the 900.
I have 4x 53mm braces that will run across the 900 from side to side... 1 on each end and 2 a cross the middle.
I'm hoping that when I clamp these down it will pull the top flat.
My question is should I be welding it with the crown to the bottom, or the crown to the top... Is welding on the bracing going to want to pull the middle down or push it up when it's cooled, and is there a method/order of welding you would recommend, bearing in mind the tension it will be under when it's clamped flat.
The 1200 edge will be welded to the 65x65x6 rails (which the 50x50 extensions slide into).
And the 900 edge will just have the 900x53x12 rails.
Should I possibly make the 53mm rail taller? Or possibly add some 65x65 across under those rails?
Hope this makes sense.
Cheers.
What welding projects are you working on? Are you proud of something you built?
How about posting some pics so other welders can get some ideas?
How about posting some pics so other welders can get some ideas?
av8or1
- av8or1
-
Ace
-
Posts:
-
Joined:Fri Aug 21, 2020 11:37 pm
-
Location:TEXAS
-
Contact:
Well your question wasn't quite clear to me somehow, but if you are searching for tips on how to minimize distortion and wondering which direction to weld stuff when constructing ... I dunno something, a table, whatever, then take a look at Jody's video (assuming that you haven't already).
https://www.youtube.com/watch?v=0pf-qQD ... ex=72&t=0s
I thought that he provided a good explanation. There are other distortion related videos out there too. Jody's is merely the first one I would recommend. Good luck with the project!
https://www.youtube.com/watch?v=0pf-qQD ... ex=72&t=0s
I thought that he provided a good explanation. There are other distortion related videos out there too. Jody's is merely the first one I would recommend. Good luck with the project!
I had my top laser cut as well. I anticipated some kind of crown so I overbuilt the frame so it would hopefully be stiff enough to straighten the top. My cross members are 2x4 tubing, 1/4" wall. (Sorry I have no idea what that is in metric).
I set to top onto the frame and bolted it on the frame using U bolts, and laid a straightedge across it (a 12' plate level i borrowed for a carpenter buddy in my case). Then marked the low spots, slipped some shims I sheared out of 22 guage sheet metal between the top and the frame. Bolted the top back down and checked with the level again. Once I was satisfied I then tacked the top to the frame from underneath, after a liberal amount of tacks to keep it from pulling/shrinking added a few short welds to completely secure it to the frame.
It was a bit of a painstaking process but I can confidently say my top is within a 1/32 of an inch.
My top is 3/4" and it bowed/straightened a lot easier than I expected. Really glad I didn't go any thinner.
Sent from my SM-G970W using Tapatalk
I set to top onto the frame and bolted it on the frame using U bolts, and laid a straightedge across it (a 12' plate level i borrowed for a carpenter buddy in my case). Then marked the low spots, slipped some shims I sheared out of 22 guage sheet metal between the top and the frame. Bolted the top back down and checked with the level again. Once I was satisfied I then tacked the top to the frame from underneath, after a liberal amount of tacks to keep it from pulling/shrinking added a few short welds to completely secure it to the frame.
It was a bit of a painstaking process but I can confidently say my top is within a 1/32 of an inch.
My top is 3/4" and it bowed/straightened a lot easier than I expected. Really glad I didn't go any thinner.
Sent from my SM-G970W using Tapatalk
Nice! Thanks for the advice.JayWal wrote:I had my top laser cut as well. I anticipated some kind of crown so I overbuilt the frame so it would hopefully be stiff enough to straighten the top. My cross members are 2x4 tubing, 1/4" wall. (Sorry I have no idea what that is in metric).
I set to top onto the frame and bolted it on the frame using U bolts, and laid a straightedge across it (a 12' plate level i borrowed for a carpenter buddy in my case). Then marked the low spots, slipped some shims I sheared out of 22 guage sheet metal between the top and the frame. Bolted the top back down and checked with the level again. Once I was satisfied I then tacked the top to the frame from underneath, after a liberal amount of tacks to keep it from pulling/shrinking added a few short welds to completely secure it to the frame.
It was a bit of a painstaking process but I can confidently say my top is within a 1/32 of an inch.
My top is 3/4" and it bowed/straightened a lot easier than I expected. Really glad I didn't go any thinner.
Sent from my SM-G970W using Tapatalk
Sent from my SM-N970F using Tapatalk
Thanks man, yea I'm really happy with it. Have some castors coming for it too.
I have a couple of files for "fireball" type squares and I will search around for ideas.
As for clamps, I'll start with modifying what I have to see what works best and add to my collection based on that.
Sent from my SM-N970F using Tapatalk
I have a couple of files for "fireball" type squares and I will search around for ideas.
As for clamps, I'll start with modifying what I have to see what works best and add to my collection based on that.
Sent from my SM-N970F using Tapatalk
I'm in the same boat, planning to make a lot of clamps and squares this winter, definitely need them. I've drawn up a couple different size squares, the next time I have to get some parts laser cut ill get those cut as well. Really looking forward to using em.
I'll try to post some pictures when I do, would like to see fixturing that you or anyone has made too.
Sent from my SM-G970W using Tapatalk
I'll try to post some pictures when I do, would like to see fixturing that you or anyone has made too.
Sent from my SM-G970W using Tapatalk
Everything is working well so far, have converted a few tools so they bolt on to the table when in use.
Castors on, super easy to move around.
And Mig fits underneath too.
Sent from my SM-N970F using Tapatalk
Castors on, super easy to move around.
And Mig fits underneath too.
Sent from my SM-N970F using Tapatalk
Return to “Welding Projects - Welding project Ideas - Welding project plans”
Jump to
- Introductions & How to Use the Forum
- ↳ Welcome!
- ↳ Member Introductions
- ↳ How to Use the Forum
- ↳ Moderator Applications
- Welding Discussion
- ↳ Metal Cutting
- ↳ Tig Welding - Tig Welding Aluminum - Tig Welding Techniques - Aluminum Tig Welding
- ↳ Mig and Flux Core - gas metal arc welding & flux cored arc welding
- ↳ Stick Welding/Arc Welding - Shielded Metal Arc Welding
- ↳ Welding Forum General Shop Talk
- ↳ Welding Certification - Stick/Arc Welding, Tig Welding, Mig Welding Certification tests - Welding Tests of all kinds
- ↳ Welding Projects - Welding project Ideas - Welding project plans
- ↳ Product Reviews
- ↳ Fuel Gas Heating
- Welding Tips & Tricks
- ↳ Video Discussion
- ↳ Wish List
- Announcements & Feedback
- ↳ Forum News
- ↳ Suggestions, Feedback and Support
- Welding Marketplace
- ↳ Welding Jobs - Industrial Welding Jobs - Pipe Welding Jobs - Tig Welding Jobs
- ↳ Classifieds - Buy, Sell, Trade Used Welding Equipment
- Welding Resources
- ↳ Tradeshows, Seminars and Events
- ↳ The Welding Library
- ↳ Education Opportunities