Scrap = subsoiler build
Posted: Tue Jul 08, 2014 12:31 am
My driveway has 25 year old crappy blacktop in random areas.
I have a bunch of scrap that looks like a three bottom subsoiler for my WD Allis to me
Figure to use one tine at first, then all three to rip it up.
Here is an old 2.5" square tube and a grader blade. Blades to be welded back to back for extra thickness in the shanks Three shanks welded up - still need the feet, or shoes, or whatever they're called I'll post more when I get it done - maybe an action video
I have a bunch of scrap that looks like a three bottom subsoiler for my WD Allis to me
Figure to use one tine at first, then all three to rip it up.
Here is an old 2.5" square tube and a grader blade. Blades to be welded back to back for extra thickness in the shanks Three shanks welded up - still need the feet, or shoes, or whatever they're called I'll post more when I get it done - maybe an action video