Page 1 of 1

Grizzly dirt screen $ question!

Posted: Thu Aug 21, 2014 5:27 am
by ShakaWelding
Hey guys just wondering on your guys prices on making a dirt screen like this.
Say if materials where all supplied and it was just for you to fab it and weld it.
What would you guys charge? It's 3meters x3m , 3m high in the back and 2m in the front.
Thanks!
ImageUploadedByTapatalk1408613251.132372.jpg
ImageUploadedByTapatalk1408613251.132372.jpg (241.18 KiB) Viewed 1629 times
ImageUploadedByTapatalk1408613233.052502.jpg
ImageUploadedByTapatalk1408613233.052502.jpg (49.54 KiB) Viewed 1629 times

Sent from my iPad using Tapatalk

Re: Grizzly dirt screen $ question!

Posted: Thu Aug 21, 2014 11:02 am
by mcoe
If materials were supplied I would charge an hourly labor fee. I would tell the customer up front that I work for X amount up front then keep track of your time. If it takes you 8 hours start to finish then charge them your rate times 8. That is how I would do it. If I was doing it and supplying the material, then I would get my material quote from the steel yard, then I would ask for money up front for the material cost that is non refundable that way if I build it then they back out, I am not stuck with the material and out my own money then charge an hourly rate to assemble.

Re: Grizzly dirt screen $ question!

Posted: Thu Aug 21, 2014 11:41 am
by rick9345
picture of sample
company is looking for competitive pricing,is it available commerically? check its price to see if you can make money based on your rate. Start high,more money,more satisfaction.

Re: Grizzly dirt screen $ question!

Posted: Thu Aug 21, 2014 6:05 pm
by ShakaWelding
Ya that's what was done when quoting it. I sourced the materials and like you said had them pay that up front and then charged the hourly rate.
I just wanted to know how long you think it would take you guys to build such a thing.


Sent from my iPhone using Tapatalk

Re: Grizzly dirt screen $ question!

Posted: Thu Aug 21, 2014 6:38 pm
by Superiorwelding
ShakaWelding wrote:Ya that's what was done when quoting it. I sourced the materials and like you said had them pay that up front and then charged the hourly rate.
I just wanted to know how long you think it would take you guys to build such a thing.


Sent from my iPhone using Tapatalk
A rough guess for you, assuming you will be cutting/fitting and you have help, a rough idea would be 8-16hours. Why so broad? I don't know what's all there nor how heavy or how accurate cuts/miters will be. If you receive it all cut to length and it fits correctly and you have help, I would think you could just weld it up in 8-10 hours. If I were to bid it I "think" I would go with 24 hours start to finish as a high estimate. Prints would obviously help sharpen those hours.
Hope this helps.
-Jonathan

Re: Grizzly dirt screen $ question!

Posted: Thu Aug 21, 2014 6:48 pm
by Otto Nobedder
My thoughts generally agree with Jonathan.

I'd think, in a shop with all the tools and equipment, this could be done in 20 hours or under, with a print present to eliminate figuring lengths yourself, even if you have to cut each piece individually. It will profit you to make a cut-list, and group repeat cuts, so you can set a stop and cut six in a row (for example) for identical length pieces.

In the example, it appears the stock "came" painted, as the welds are unpainted, so that suggests painting is not a required step.

Steve S

Re: Grizzly dirt screen $ question!

Posted: Thu Aug 21, 2014 10:30 pm
by ShakaWelding
This was all done off the back of my truck using a mobile set up. There were no drawings or anything. So I had to figure everything out myself. Over her in Aus the shs/rhs comes painted or galv.



Sent from my iPhone using Tapatalk

Re: Grizzly dirt screen $ question!

Posted: Thu Aug 21, 2014 10:34 pm
by Superiorwelding
I didn't catch the fact that you already did this job. So, what did the labor time come out to?
-Jonathan

Re: Grizzly dirt screen $ question!

Posted: Fri Aug 22, 2014 12:01 am
by 79jasper
Any rough estimation what it weighs?
Old employer could use something like that.

Sent from my SM-G900R4 using Tapatalk

Re: Grizzly dirt screen $ question!

Posted: Fri Aug 22, 2014 8:07 pm
by ShakaWelding
Total time to do it all was just around 38 hours. This was done by myself with no TA. Stick welded out.
I think considering the fact that I was by myself cut everything on site and did it all off the back of my truck that is pretty good. What do you guys reckon?


Sent from my iPhone using Tapatalk

Re: Grizzly dirt screen $ question!

Posted: Fri Aug 22, 2014 8:09 pm
by ShakaWelding
And jasper the weight was around 3500lbs


Sent from my iPhone using Tapatalk

Re: Grizzly dirt screen $ question!

Posted: Fri Aug 22, 2014 10:19 pm
by Otto Nobedder
ShakaWelding wrote:Total time to do it all was just around 38 hours. This was done by myself with no TA. Stick welded out.
I think considering the fact that I was by myself cut everything on site and did it all off the back of my truck that is pretty good. What do you guys reckon?


Sent from my iPhone using Tapatalk
My 20 hour estimate presumed a shop, with the appropriate tools in their stations, and a drawing.

You have a "design-build".

38 hours, off the back of a truck, in the dirt, with (I'm guessing) a sketch on a napkin, sounds like a perfectly reasonable number for a job well done.

Steve S

Re: Grizzly dirt screen $ question!

Posted: Sun Aug 24, 2014 1:20 am
by ShakaWelding
Thanks for that Steve! I thought it came out great knowing it was done out on site.



Sent from my iPhone using Tapatalk

Re: Grizzly dirt screen $ question!

Posted: Mon Aug 25, 2014 8:05 pm
by Otto Nobedder
Good on ya, for the canopy.

That's a BIG plus working outside.

Steve S

Re: Grizzly dirt screen $ question!

Posted: Thu Sep 11, 2014 7:32 pm
by ShakaWelding
That canopy has helped like none other. Her is Aus the sun gets so strong and you can just feel in scolding you.


Sent from my iPhone using Tapatalk

Re: Grizzly dirt screen $ question!

Posted: Thu Sep 11, 2014 7:33 pm
by ShakaWelding
This coming week I'm building a stick rake for an excavator. Anyone ever done this? Most of the time they are on dozers but customer wants it on his excavator.


Sent from my iPhone using Tapatalk

Re: Grizzly dirt screen $ question!

Posted: Fri Sep 12, 2014 2:31 am
by 79jasper
Like a ripper bar?

Sent from my SM-G900R4 using Tapatalk

Re: Grizzly dirt screen $ question!

Posted: Fri Sep 19, 2014 7:43 pm
by ShakaWelding
Ya here's the stick rake partially done. Still going to make the quick connect for the excavator and some other things. This is the design the customer wanted. Biz400 plates(AR400) pre heat and post heat with 3 passes each side. Over 70 meters of weld! (230')



Sent from my iPad using Tapatalk