Stainless restaurant prep sink. Can't find any specs. Looks to be 16ga 304. When fabbed, they tacked a few times from the bottom, welded tight on top, THEN, they ground WAY too much material and it is separating. Thinking backer plate and fill the separation. Opinions? Advise?

Image


Sent from my iPhone using Tapatalk
Coldman
  • Posts:
  • Joined:
    Mon Dec 15, 2014 2:16 am
  • Location:
    Oz

The best thing would be to close the gap. If you can't you could lay some 1/16" filler in there and walk over the top of it to fuse it all together . You can end up with a big joint but can be build up and shaped afterwards. It is what it is.
Flat out like a lizard drinkin'
Kevin_Holbrook
  • Posts:
  • Joined:
    Wed Oct 15, 2014 1:02 am

i'm guessing your showing the bottom of the sink

i'd tap the seam back and tack then weld it up from the inside
Poland308
  • Posts:
  • Joined:
    Thu Sep 10, 2015 8:45 pm
  • Location:
    Iowa

Run about 65-70 amps. Use 1/16 or dab at it with 3/32
I have more questions than answers

Josh
j_0
  • j_0
  • New Member
    New Member
  • Posts:
  • Joined:
    Thu May 26, 2016 10:13 pm

Kevin_Holbrook wrote:i'm guessing your showing the bottom of the sink

i'd tap the seam back and tack then weld it up from the inside
nope that is topside around the bowl!


Sent from my iPhone using Tapatalk
Kevin_Holbrook
  • Posts:
  • Joined:
    Wed Oct 15, 2014 1:02 am

j_0 wrote:
Kevin_Holbrook wrote:i'm guessing your showing the bottom of the sink

i'd tap the seam back and tack then weld it up from the inside
nope that is topside around the bowl!


Sent from my iPhone using Tapatalk
if you can get behind the seam i would use a chill block then from the front tack it up nice along the entire seam then weld
Rick_H
  • Posts:
  • Joined:
    Sat Feb 08, 2014 1:50 pm
  • Location:
    PA/MD

ID close the seam up, speed tack it every 1/2"-3/4" and weld across the entire seam, pulse if you can and use some small diameter filler. 2.5pps, 50amps, 75% peak, 25% background, .030-.035" filler. The backing block will help you but at those setting you should be able to weld without blowing through.
I weld stainless, stainless and more stainless...Food Industry, sanitary process piping, vessels, whatever is needed, I like to make stuff.
ASME IX, AWS 17.1, D1.1
Instagram #RNHFAB
Rick_H
  • Posts:
  • Joined:
    Sat Feb 08, 2014 1:50 pm
  • Location:
    PA/MD

Id close the seam up, speed tack it every 1/2"-3/4" and weld across the entire seam, pulse if you can and use some small diameter filler. If 16g, 2.5pps, 50amps, 75% peak, 25% background, .030-.035" filler. The backing block will help you but at those setting you should be able to weld without blowing through.
I weld stainless, stainless and more stainless...Food Industry, sanitary process piping, vessels, whatever is needed, I like to make stuff.
ASME IX, AWS 17.1, D1.1
Instagram #RNHFAB
j_0
  • j_0
  • New Member
    New Member
  • Posts:
  • Joined:
    Thu May 26, 2016 10:13 pm

Lots of good here. Solution I am picturing now is a combo of replies: close, chill, tack, build, shape.


Sent from my iPhone using Tapatalk
Diesel
  • Posts:
  • Joined:
    Wed Apr 15, 2015 6:03 pm
  • Location:
    Illinois

My concern would be warping. I'd just tack every few inches from the back side after its been pulled together and then take some 2000g sandpaper or steel wool and "rebrush" the finish.
Country isn't country unless it's classic.
Kevin_Holbrook
  • Posts:
  • Joined:
    Wed Oct 15, 2014 1:02 am

Diesel wrote:My concern would be warping. I'd just tack every few inches from the back side after its been pulled together and then take some 2000g sandpaper or steel wool and "rebrush" the finish.
being a restaurant prep sink ,it's probably already warped or soon will be